28th November 2012

The base layer of the footpath and perimeter drains are in and the building is now protected from flooding.

The larch ceiling is nearly complete giving a warm feel to the building.

The perimeter wrought ironworks are completed in their design as seen below and will be galvanised and painted for installation on the 13th December once the security gates are installed the site will be secure for final marble and bronze frontage.