26th September 2012

Despite the rain the final pads and wall footings were poured today. A concrete pump was used to transfer the concrete from the mixers to the site. In total around 80 tonnes of concrete have been used just for the foundations. By Tuesday next week the final concrete will have been poured for the main slab and ready for the steel frame to be erected.

 